ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 Technical Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-25-2009   #11
LGAFF
 
LGAFF's Avatar
 
Join Date: Mar 2007
Location: Crystal Lake, IL
Posts: 7,194
Default Re: LT5 Assembly Project

Ordered a new LFT Intake cam and wear strips from Kurt.....so getting closer to moving forward. I would like to complete the engine this winter and have it in the 90 by next spring.

I am guessing that the cam bolts cannot be reused. So I still need to pick up:

1)Replacement pistons and liners...(I have a lead on these, just need to pull the trigger)

2)Rod bearings

3)Cam bolts

4)Washers for head bolts

5)balancer

-The heads need some work
*welding intake ports for a better IH seal
*IH bolt needs to be extracted that broke off inside

I was wondering best way to check valve stems to ensure they are lined up properly and that valves are sealing. I am also wondering what is needed to ensure proper torque specs on the engine bolts:thread chasers, good torque wrench(looking for brand name)etc.
__________________
LGAFF
90 #966-150K miles-sold
92 #234-sold
1987 Callaway TT #17
1991 ZR-1 #1359

Last edited by LGAFF; 05-25-2009 at 09:55 AM.
LGAFF is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:37 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020