05-12-2009 | #1 |
Join Date: Aug 2008
Location: Houston 90 Red ZR-1
Posts: 2,320
|
Injector machining done.
Injector housing and thick plenum gaskets complete. The cnc work is done.
Those gasketes almost match my table. And when I'm done with the hand work I'm going to be looking for someone to powder coat this stuff and make it look sharp again. |
|
|