ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 General Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-27-2020   #1
ram_g
 
Join Date: Jun 2020
Location: Houston, TX
Posts: 183
Default Aaaarghhh...sacrifice to The Valley!

And I was SOOO close...

I've been working on my plenum and injector R&R all week, in between various T'giving commitments.

In the final home stretch, trying to put on that super-fiddly DIS connector in the back, having read all about bent pin horror stories. And learning that key success factors are having thin hands and no beer belly to come in the way as you bend and crane in awkward positions.

And then my 1/4" long socket came loose and fell into the valley! I looked and looked and simply could not see where it went. At that point I was so far into the re-install that I simply gave up and proceeded to finish.

After buttoning everything up, the car started just fine, no untoward noises. It's raining nonstop though, so not a good time to test out the new injectors.

So what does anybody think will happen to the socket? Stay in the valley until the next plenum pull? Drop out somewhere along the way? Will it hurt anything?
ram_g is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:51 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020