ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 General Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-03-2014   #1
yzpilot
 
Join Date: Jul 2013
Location: Oceanside, California
Posts: 66
Default Tackleing the big job before summer!!

So it's finally time to get my pride and joy ready for the summer. If any of you followed the story of how I got my Z, you know she definitely needs paint to get ready for the ball! So I have finally got everything I need to start the project. Figured I would start with the engine compartment before starting the body. I will be posting photos of the progress if anyone is interested, or if anyone needs a hand for future projects.
Attached Images
File Type: jpg SAM_6415.jpg (141.9 KB, 49 views)
__________________
Erik
________________________
1991 #422
Blk/Blk
yzpilot is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:45 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020