ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 Technical Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-01-2013   #1
Funracer
 
Join Date: Oct 2011
Location: Shalimar, FL
Posts: 192
Default Plenum Done!

My biggest project to date.

Plenum and IHs pulled and sent out for porting and PC, entire secondary system removed, new chip.





Finally finished everything and made a couple of runs up and down the
street. I was relieved when it started and idled normally. It runs as good as it looks. I'm gonna need new tires, for sure.

Special thanks to Lee Gaffigan for all the time he spent porting, and
for making sure everything looked great at the PC company. Wonderful
customer service and plenty of moral support along the way.

All the new stuff makes everything else look dull. Got plenty of other parts
to clean up now.

PS: forgot to put the TPS cover on before the pics.

=D>
Funracer is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:24 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020