11-25-2012 | #1 |
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
|
Winter Project (Phase 1)
Well I guess you can call it a winter"ish" project due to the fact that here in Louisiana we get to drive our cars year around. This project started at the end of August and on the drive to garage where the project would be performed, she rolled 56k miles.
Phase 1: Powder coating engine FIC SS injectors Stainless bolts Secondaries removed Charcoal system removed Top end gasket set from Jerry's Chip tune by Pete And can't forget lots of cleaning Engine before pic: Let the tear down begin... The pile of parts is growing...
__________________
CJ Daniel [B]1991[/B] ZR-1 #834 [COLOR=royalblue][B]Steel Blue Metallic/Steel Blue[/B][/COLOR] [COLOR=red]Frank Approved ZR-1[/COLOR] [SIZE=1]- Ported air horn, throttle body, plenum and injector housings (Tommy Morrison)[/SIZE] [SIZE=1]- FIC SS Injectors / Nology hot wires / Screemin Deamin coils[/SIZE] [SIZE=1]- Fluidyne aluminum radiator and 9 row aluminum oil cooler[/SIZE] [SIZE=1]- 4.10 gears / Fidanza light weight flywheel / Hurst short throw shifter[/SIZE] [SIZE=1]- Stainless Works long tube headers / Borla exhaust with x-pipe[/SIZE] [SIZE=1]- DRM Coilovers / 32mm front 26mm rear sway bars[/SIZE] [SIZE=1]- ASM bolt in 4 point roll bar[/SIZE] [SIZE=1]- 93 ZR-1 Sawblades[/SIZE] Last edited by CJ_ZR1; 11-26-2012 at 12:16 AM. |
|
|