ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 Technical Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-04-2012   #11
LGAFF
 
LGAFF's Avatar
 
Join Date: Mar 2007
Location: Crystal Lake, IL
Posts: 7,193
Default Re: LT5 Assembly Project

Well I had a setback a few weeks ago, there is an internal plug inside the head in the timing chain area....this plug was not in my heads. This required me to retime the cams, as the chain tensioners had to be moved to insert the plugs....

So here is where we stand...

Trans out....
Cam covers sealed, and tensioners set

Bought an engine hoist today...

So old engine should be out this weekend and new one in...

__________________
LGAFF
90 #966-150K miles-sold
92 #234-sold
1987 Callaway TT #17
1991 ZR-1 #1359
LGAFF is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:02 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020