ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 General Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-13-2011   #1
Alberta_ZR1
 
Join Date: Jul 2010
Location: Calgary Alberta
Posts: 191
Default Winter Project Finally Finished - Time to Drive (PICS)

Well it's been a long 2.5 months, but the winter project is finally completed!!! After seeing some of the motors on here, I was envious and decided that my LT5 was just not up to par. So in the process of having the top end powder coated, I decided to do some major preventative maintenance.
  • Complete top end reseal - didn't break a single bolt!!!
  • Fresh powder coat
  • New stainless steel hardware
  • New fuel filter, injectors, and regulator
  • New water pump and thermostat
  • New alternator
  • New PCV's
  • New serpentine belt and tensioner pulley
  • New coils, plugs, wires
  • New secondary vacuum pump
  • Radiator professionally cleaned and pressure tested
  • New Samco rad hoses
  • New weather-stripping around the cab
  • CAGS installed
  • New Silver Star headlights
  • Fan by-pass switch
  • Air intake stiffener
  • New keyless entry key fobs
The UPS driver has delivered so many packages to my house that he knows me by name now.

A BIG thanks to Jerry for the gaskets and plug wires and to Marc for the new emblems and plenum video!! Also all the past posts and knowledge on this forum was a huge help!!

A few pictures to celebrate an end to this lengthy project






__________________
[SIZE=1][SIZE=2]Tyler[/SIZE]
[SIZE=1]1993 ZR-1 - Polo Green[/SIZE]
[/SIZE]
Alberta_ZR1 is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:39 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020