ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 Technical Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-05-2010   #10
LGAFF
 
LGAFF's Avatar
 
Join Date: Mar 2007
Location: Crystal Lake, IL
Posts: 7,194
Default Re: LT5 Assembly Project

Wait til you see the pics of the head. I stopped by and dropped off a intake valve at the shop, took some pics of the heads and will post them tonight.

For $800.00 Valve job, reshaped the ports, cleaned up the combustion chambers, blasted the intake runners, and pulled out the cross threaded IH bolt out...this required him to reconstruct the area.....I don't know how the prior owner could have gotten the bolt in like that.

Only issue was the new lifters I bought on ebay are too tall and will not work...but my old ones are in great shape.

Before and after pics tonight.
__________________
LGAFF
90 #966-150K miles-sold
92 #234-sold
1987 Callaway TT #17
1991 ZR-1 #1359
LGAFF is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:21 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020