10-22-2018 | #11 | |
Join Date: Dec 2003
Location: Chicagoland,IL
Posts: 2,675
|
Re: Building a beast...doing a 391
Quote:
We still have to do some fine tuning, driveability is tuned with no issues. This 391 motor project took 3 months to complete. Other repairs and issues took an extra 4 weeks diagnosing and waiting for parts. Ted you and i both know builds like these used to take 1-2 years. Evan was great to work with very patient. Thanks Pete
__________________
'91 #1635 PoloGreen 350 LT5 11.09 @ 129.27 11.04 @ 128.86 474RWHP 400RWTQ http://www.youtube.com/watch?v=SFNFOhGGlR4 http://www.youtube.com/watch?v=ZlRIOMwaDYY https://sites.google.com/site/peteszr1garage Last edited by Pete; 10-22-2018 at 11:40 PM. |
|
Thread Tools | |
Display Modes | |
|
|