ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 General Postings

Reply
 
Thread Tools Display Modes
Old 11-25-2012   #1
CJ_ZR1
 
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
Default Winter Project (Phase 1)

Well I guess you can call it a winter"ish" project due to the fact that here in Louisiana we get to drive our cars year around. This project started at the end of August and on the drive to garage where the project would be performed, she rolled 56k miles.



Phase 1:
Powder coating engine
FIC SS injectors
Stainless bolts
Secondaries removed
Charcoal system removed
Top end gasket set from Jerry's
Chip tune by Pete
And can't forget lots of cleaning

Engine before pic:



Let the tear down begin...



The pile of parts is growing...

__________________
CJ Daniel

[B]1991[/B] ZR-1 #834 [COLOR=royalblue][B]Steel Blue Metallic/Steel Blue[/B][/COLOR]
[COLOR=red]Frank Approved ZR-1[/COLOR]

[SIZE=1]- Ported air horn, throttle body, plenum and injector housings (Tommy Morrison)[/SIZE]
[SIZE=1]- FIC SS Injectors / Nology hot wires / Screemin Deamin coils[/SIZE]
[SIZE=1]- Fluidyne aluminum radiator and 9 row aluminum oil cooler[/SIZE]
[SIZE=1]- 4.10 gears / Fidanza light weight flywheel / Hurst short throw shifter[/SIZE]
[SIZE=1]- Stainless Works long tube headers / Borla exhaust with x-pipe[/SIZE]
[SIZE=1]- DRM Coilovers / 32mm front 26mm rear sway bars[/SIZE]
[SIZE=1]- ASM bolt in 4 point roll bar[/SIZE]
[SIZE=1]- 93 ZR-1 Sawblades[/SIZE]

Last edited by CJ_ZR1; 11-26-2012 at 12:16 AM.
CJ_ZR1 is offline   Reply With Quote
Old 11-25-2012   #2
CJ_ZR1
 
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
Default Re: Winter Project (Phase 1)

Secondary removal:



Pulling the butterfly shaft wasn't too bad once we cut a piece of metal pipe to about 1.5"; and used a nut, washer, and socket to pry the bearing out.





Freeze plug where butterfly shaft was located

CJ_ZR1 is offline   Reply With Quote
Old 11-25-2012   #3
CJ_ZR1
 
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
Default Re: Winter Project (Phase 1)

While waiting for engine parts to return from powder coating, we had a chance to clean whole front end of the car.





Parts have arrived!





Had the stainless steel air box powder coated to match...

CJ_ZR1 is offline   Reply With Quote
Old 11-26-2012   #4
CJ_ZR1
 
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
Default Re: Winter Project (Phase 1)

Phase 1 complete!
It took about 6 weeks from tear down to first start up. We changed oil and went for drive about 3 am Saturday morning, sleep 2 hrs and then headed to car show an hour away in Lafayette, LA. My Z ended up being selected 2nd in C4 category, 1st being a red/red 96 lt4 car (he had car super clean).









Group of 4 that drove down for show.



It was a long project but well worth it.
Many thanks to Daniel Mcguffee, Pete, Jerry at http://jerrysgaskets.com/ and Mike at http://www.thepowdercoater.com/

Phase 2 should be starting before Christmas:
DRM Coilovers
32mm front and 26 mm rear sway bars
R&D frame brace
__________________
CJ Daniel

[B]1991[/B] ZR-1 #834 [COLOR=royalblue][B]Steel Blue Metallic/Steel Blue[/B][/COLOR]
[COLOR=red]Frank Approved ZR-1[/COLOR]

[SIZE=1]- Ported air horn, throttle body, plenum and injector housings (Tommy Morrison)[/SIZE]
[SIZE=1]- FIC SS Injectors / Nology hot wires / Screemin Deamin coils[/SIZE]
[SIZE=1]- Fluidyne aluminum radiator and 9 row aluminum oil cooler[/SIZE]
[SIZE=1]- 4.10 gears / Fidanza light weight flywheel / Hurst short throw shifter[/SIZE]
[SIZE=1]- Stainless Works long tube headers / Borla exhaust with x-pipe[/SIZE]
[SIZE=1]- DRM Coilovers / 32mm front 26mm rear sway bars[/SIZE]
[SIZE=1]- ASM bolt in 4 point roll bar[/SIZE]
[SIZE=1]- 93 ZR-1 Sawblades[/SIZE]

Last edited by CJ_ZR1; 11-26-2012 at 12:15 AM.
CJ_ZR1 is offline   Reply With Quote
Old 11-26-2012   #5
Blue Flame Restorations
 
Blue Flame Restorations's Avatar
 
Join Date: Feb 2010
Location: Pendleton, IN
Posts: 3,904
Default Re: Winter Project (Phase 1)

CJ, congrats on a job well done! Daniel is a great guy to have help, but you already knew that!

Can't beat Pete and Jerry. So many great people on the forum. Great to see the Brotherhood in action.

Beautiful Z, BTW.

Brett
__________________
1988 KOH Prototype EX5023 sold
1990 ZR-1 #444 Convertible
1990 ZR-1 Black #966
1991 ZR-1 Quazar Blue #296
1957 Duntov SS Project
Blue Flame Restorations is offline   Reply With Quote
Old 11-26-2012   #6
2ZR1S
 
2ZR1S's Avatar
 
Join Date: Mar 2006
Location: Lubbock, TX
Posts: 79
Default Re: Winter Project (Phase 1)

CJ, man it looks good. Keep the pictures coming as the work progresses.
Thanks
Jon R
__________________
Jon R. Member #490
1992 ZR-1 Arctic White/Red
2008 Z51 Silver 6 spd (Daily driver)
2ZR1S is offline   Reply With Quote
Old 11-26-2012   #7
carter200
 
carter200's Avatar
 
Join Date: Jun 2004
Location: Texas
Posts: 2,431
Default Re: Winter Project (Phase 1)

Quote:
Originally Posted by CJ_ZR1 View Post
Phase 1 complete!
It took about 6 weeks from tear down to first start up. We changed oil and went for drive about 3 am Saturday morning, sleep 2 hrs and then headed to car show an hour away in Lafayette, LA. My Z ended up being selected 2nd in C4 category, 1st being a red/red 96 lt4 car (he had car super clean).






CJ,
You need a little CT Machining bling on that bad boy. Throttle body plates are in stock and coolant pipes can be a one day turnaround along with what ever else you want that I make or your imagination can produce. Nice looking job you did, Carter
__________________
95 ZR-1
BLK/Gry
#392

LT5 Reg# 868 *RIP*
ZR1NET Founding Mem #155
carter200 is offline   Reply With Quote
Old 11-26-2012   #8
Fully Vetted
 
Fully Vetted's Avatar
 
Join Date: Sep 2012
Location: Rockwall, Tx
Posts: 1,510
Default Re: Winter Project (Phase 1)

"Throttle Body Plates"...Do you mean the cover?
__________________
_________________

1994 AB/Grey #141

430 RWHP/392 RWTQ

FBI Lyposuction / Secondaries relieved of duty / SW Long Tube Headers / Corsa Exhaust / FIC SS Injectors / MSD Coils / Lightweight Pulleys / Corey tuned
B & M Shifter / Aluminum Flywheel / Samco Hoses / Shelby Series One's / C4 No Flex Frame Stiffener

BBC - Bling By Carter:
Custom ZR-1 Center Caps / Custom Plenum Plate / Air Box Knobs / TB Cover / Oil Filter Cover
Fully Vetted is offline   Reply With Quote
Old 11-26-2012   #9
vilant
 
Join Date: Jun 2012
Location: PA
Posts: 772
Default Re: Winter Project (Phase 1)

Looks great. Nice job.
__________________
Joe
1990 Bright Red ZR-1 #2599
vilant is offline   Reply With Quote
Old 11-26-2012   #10
VetteVet
 
VetteVet's Avatar
 
Join Date: Jan 2009
Location: Mandeville, LA
Posts: 340
Default Re: Winter Project (Phase 1)

CJ,

Your car is coming along nicely!

I've got to make plans to get together with you and Daniel.

Jep
VetteVet is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:58 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020