|
11-25-2012 | #1 |
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
|
Winter Project (Phase 1)
Well I guess you can call it a winter"ish" project due to the fact that here in Louisiana we get to drive our cars year around. This project started at the end of August and on the drive to garage where the project would be performed, she rolled 56k miles.
Phase 1: Powder coating engine FIC SS injectors Stainless bolts Secondaries removed Charcoal system removed Top end gasket set from Jerry's Chip tune by Pete And can't forget lots of cleaning Engine before pic: Let the tear down begin... The pile of parts is growing...
__________________
CJ Daniel [B]1991[/B] ZR-1 #834 [COLOR=royalblue][B]Steel Blue Metallic/Steel Blue[/B][/COLOR] [COLOR=red]Frank Approved ZR-1[/COLOR] [SIZE=1]- Ported air horn, throttle body, plenum and injector housings (Tommy Morrison)[/SIZE] [SIZE=1]- FIC SS Injectors / Nology hot wires / Screemin Deamin coils[/SIZE] [SIZE=1]- Fluidyne aluminum radiator and 9 row aluminum oil cooler[/SIZE] [SIZE=1]- 4.10 gears / Fidanza light weight flywheel / Hurst short throw shifter[/SIZE] [SIZE=1]- Stainless Works long tube headers / Borla exhaust with x-pipe[/SIZE] [SIZE=1]- DRM Coilovers / 32mm front 26mm rear sway bars[/SIZE] [SIZE=1]- ASM bolt in 4 point roll bar[/SIZE] [SIZE=1]- 93 ZR-1 Sawblades[/SIZE] Last edited by CJ_ZR1; 11-26-2012 at 12:16 AM. |
11-25-2012 | #2 |
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
|
Re: Winter Project (Phase 1)
Secondary removal:
Pulling the butterfly shaft wasn't too bad once we cut a piece of metal pipe to about 1.5"; and used a nut, washer, and socket to pry the bearing out. Freeze plug where butterfly shaft was located |
11-25-2012 | #3 |
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
|
Re: Winter Project (Phase 1)
While waiting for engine parts to return from powder coating, we had a chance to clean whole front end of the car.
Parts have arrived! Had the stainless steel air box powder coated to match... |
11-26-2012 | #4 |
Join Date: Apr 2012
Location: Pineville, Louisiana
Posts: 57
|
Re: Winter Project (Phase 1)
Phase 1 complete!
It took about 6 weeks from tear down to first start up. We changed oil and went for drive about 3 am Saturday morning, sleep 2 hrs and then headed to car show an hour away in Lafayette, LA. My Z ended up being selected 2nd in C4 category, 1st being a red/red 96 lt4 car (he had car super clean). Group of 4 that drove down for show. It was a long project but well worth it. Many thanks to Daniel Mcguffee, Pete, Jerry at http://jerrysgaskets.com/ and Mike at http://www.thepowdercoater.com/ Phase 2 should be starting before Christmas: DRM Coilovers 32mm front and 26 mm rear sway bars R&D frame brace
__________________
CJ Daniel [B]1991[/B] ZR-1 #834 [COLOR=royalblue][B]Steel Blue Metallic/Steel Blue[/B][/COLOR] [COLOR=red]Frank Approved ZR-1[/COLOR] [SIZE=1]- Ported air horn, throttle body, plenum and injector housings (Tommy Morrison)[/SIZE] [SIZE=1]- FIC SS Injectors / Nology hot wires / Screemin Deamin coils[/SIZE] [SIZE=1]- Fluidyne aluminum radiator and 9 row aluminum oil cooler[/SIZE] [SIZE=1]- 4.10 gears / Fidanza light weight flywheel / Hurst short throw shifter[/SIZE] [SIZE=1]- Stainless Works long tube headers / Borla exhaust with x-pipe[/SIZE] [SIZE=1]- DRM Coilovers / 32mm front 26mm rear sway bars[/SIZE] [SIZE=1]- ASM bolt in 4 point roll bar[/SIZE] [SIZE=1]- 93 ZR-1 Sawblades[/SIZE] Last edited by CJ_ZR1; 11-26-2012 at 12:15 AM. |
11-26-2012 | #5 |
Join Date: Feb 2010
Location: Pendleton, IN
Posts: 3,904
|
Re: Winter Project (Phase 1)
CJ, congrats on a job well done! Daniel is a great guy to have help, but you already knew that!
Can't beat Pete and Jerry. So many great people on the forum. Great to see the Brotherhood in action. Beautiful Z, BTW. Brett
__________________
1988 KOH Prototype EX5023 sold 1990 ZR-1 #444 Convertible 1990 ZR-1 Black #966 1991 ZR-1 Quazar Blue #296 1957 Duntov SS Project |
11-26-2012 | #6 |
Join Date: Mar 2006
Location: Lubbock, TX
Posts: 79
|
Re: Winter Project (Phase 1)
CJ, man it looks good. Keep the pictures coming as the work progresses.
Thanks Jon R
__________________
Jon R. Member #490 1992 ZR-1 Arctic White/Red 2008 Z51 Silver 6 spd (Daily driver) |
11-26-2012 | #7 | |
Join Date: Jun 2004
Location: Texas
Posts: 2,431
|
Re: Winter Project (Phase 1)
Quote:
You need a little CT Machining bling on that bad boy. Throttle body plates are in stock and coolant pipes can be a one day turnaround along with what ever else you want that I make or your imagination can produce. Nice looking job you did, Carter
__________________
95 ZR-1 BLK/Gry #392 LT5 Reg# 868 *RIP* ZR1NET Founding Mem #155 |
|
11-26-2012 | #8 |
Join Date: Sep 2012
Location: Rockwall, Tx
Posts: 1,510
|
Re: Winter Project (Phase 1)
"Throttle Body Plates"...Do you mean the cover?
__________________
_________________ 1994 AB/Grey #141 430 RWHP/392 RWTQ FBI Lyposuction / Secondaries relieved of duty / SW Long Tube Headers / Corsa Exhaust / FIC SS Injectors / MSD Coils / Lightweight Pulleys / Corey tuned B & M Shifter / Aluminum Flywheel / Samco Hoses / Shelby Series One's / C4 No Flex Frame Stiffener BBC - Bling By Carter: Custom ZR-1 Center Caps / Custom Plenum Plate / Air Box Knobs / TB Cover / Oil Filter Cover |
11-27-2012 | #9 |
Join Date: Jun 2004
Location: Texas
Posts: 2,431
|
Re: Winter Project (Phase 1)
CJ, I did NOT mean to hi-jack your post.
__________________
95 ZR-1 BLK/Gry #392 LT5 Reg# 868 *RIP* ZR1NET Founding Mem #155 |
11-27-2012 | #10 |
Join Date: Sep 2012
Location: Rockwall, Tx
Posts: 1,510
|
Re: Winter Project (Phase 1)
I'll take the blame for the hijacking...
I need that TB plate. Do you have one with AB lettering instead of black? BTW..I have a set of your ZR-1 center caps for my new CS wheels. Nice work!
__________________
_________________ 1994 AB/Grey #141 430 RWHP/392 RWTQ FBI Lyposuction / Secondaries relieved of duty / SW Long Tube Headers / Corsa Exhaust / FIC SS Injectors / MSD Coils / Lightweight Pulleys / Corey tuned B & M Shifter / Aluminum Flywheel / Samco Hoses / Shelby Series One's / C4 No Flex Frame Stiffener BBC - Bling By Carter: Custom ZR-1 Center Caps / Custom Plenum Plate / Air Box Knobs / TB Cover / Oil Filter Cover |
Thread Tools | |
Display Modes | |
|
|