Sure
The top end should be done 2-3 weeks
The block is in Spokane now. They need to make tq plate for the block. I think he said it will be 4" T-6.
ARP studs for the bottom end are a no go. I tried to have them made, no luck. I'm to small of a order, I guess. I wanted 5 sets made, no luck.
Ron Woods is working on having them made ( multiples ).
Everything on the LT5 just takes forever to get done. It has not been a cash shortage on my end. I guess if I did all the work myself it would go faster. I don't have Rottler boring and Sunnen honing tools. As porting, I'm only OK at it. I want this little 402 hit 625-640 (motor hp) then the NOS on top.
How yours doing Todd