Inside the left front well....
Before cleaning and first preliminary cleaning....should come up good after I'm finished....
All 6 side screws out....
Some of the wrenches needed to do the job....would have been a breeze for the top screws on both sides with a 7mm ratchet wrench....but couldn't find one locally....also 9/32" socket or wrench will also work....
Was too hot to go out to the 74....so the portable garage AC unit did good in the above 90 degree temps today...garage was in the low 80's and comfortable....[emoji16][emoji16]
20190820_184139.jpg20190820_201758.jpg20190820_193633.jpg20190820_193623.jpeg20190820_184048.jpeg20190820_184101.jpg
Sent from my SM-G965U using
ZR-1 Net Registry mobile app