View Single Post
Old 09-14-2018   #54
jss06c6
 
Join Date: Aug 2015
Location: Magnolia, Texas
Posts: 884
Default Re: Plenum & Injector Housing Porting

TB reassembled and ready.. the 6-0.6 metric Torx screws gave me fits removing them (small tack weld used to lock them in place). I swapped over to 8-32 button head screws and used blue thread locker. Much easier and will allow future rebuild if necessary. No DAG needed. Throttle plates have virtually no light around them! On to the final valley cleaning and reassembly..[ATTACH][ATTACH][ATTACH][ATTACH]

Sent from my XT1585 using ZR-1 Net Registry mobile app
Attached Images
File Type: jpeg IMG_20180914_151938420.jpeg (72.7 KB, 52 views)
File Type: jpeg IMG_20180914_151955251.jpeg (83.6 KB, 49 views)
File Type: jpeg IMG_20180914_152004955.jpeg (64.0 KB, 49 views)
File Type: jpeg IMG_20180914_152019523.jpeg (71.9 KB, 57 views)

Last edited by jss06c6; 09-14-2018 at 04:38 PM.
jss06c6 is offline   Reply With Quote