ZR-1 Net Registry Forums  

Go Back   ZR-1 Net Registry Forums > C4 ZR-1 > C4 ZR-1 Technical Postings

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-22-2015   #10
5ABI VT
 
Join Date: Jun 2013
Location: Toronto
Posts: 782
Default Re: 427 LT5 Build 2 underway

Very cool

Silly idea but thought I'd mention it anyways I was thinking to run a pcv hose from the rear all the way back to the tire tray and put a big reservoir of some sort like a fuel cell where the spare tire goes to increase the volume in the system. All I did for now is run a vacuum line all the way to the front of the car ahead of the wheel where I put a catch can hoping to increase volume slightly and catch some oil.
5ABI VT is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 09:15 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright ZR-1 Net Registry 2020