Jagdpanzer
07-18-2010, 11:08 PM
For the 402 LT5 stroker project I will be ditching the secondaries.
Turned out these aluminum pieces on the lathe to plug the shaft bores remaining in the cylinder heads. The plugs are slightly oversized, sealed with a dab of Loctite 462 and driven in with a hammer. Protruding part will be taken care of during porting. For the upper blind hole I drilled a small hole through the plug in order to vent the air trapped behind it as it was driven in.
http://i540.photobucket.com/albums/gg333/pwasinger/166-6628_IMG.jpg
http://i540.photobucket.com/albums/gg333/pwasinger/166-6631_IMG.jpg
http://i540.photobucket.com/albums/gg333/pwasinger/166-6633_IMG.jpg
Turned out these aluminum pieces on the lathe to plug the shaft bores remaining in the cylinder heads. The plugs are slightly oversized, sealed with a dab of Loctite 462 and driven in with a hammer. Protruding part will be taken care of during porting. For the upper blind hole I drilled a small hole through the plug in order to vent the air trapped behind it as it was driven in.
http://i540.photobucket.com/albums/gg333/pwasinger/166-6628_IMG.jpg
http://i540.photobucket.com/albums/gg333/pwasinger/166-6631_IMG.jpg
http://i540.photobucket.com/albums/gg333/pwasinger/166-6633_IMG.jpg